Construction Control of South Navigable Cable-Stayed Bridge of Hangzhou Bay Sea-Crossing Bridge

周绪红,乔朋,狄谨,覃兴旭
2009-01-01
Abstract:Backgrounded by the south navigable cable-stayed bridge of Hangzhou Bay Sea-Crossing Bridge,the construction control of the similar type bridges was studied in accordance with the structural characteristics of cable-stayed bridge and on the basis of the simulation calculation of construction process of whole bridge.The rational completion state of the bridges was given by the least bending energy method,the solution to the rational tensioning cable forces during construction was obtained by the forward iteration method and the rational construction state of the bridges was determined.Moreover,the construction process control of the bridges was made as well by the construction control method of combined self adaption and feed back.Practice proves that the method for determining the construction state and construction control in the paper is rational.