Study of construction control for Heigou Super-large Bridge in Inner Mongolia

BAI Zhi-ping,ZHANG Xie-dong,WANG Chun
DOI: https://doi.org/10.3969/j.issn.1005-0574.2007.05.003
2007-01-01
Abstract:There are some structural features for continuous fame bridge itself at the construction stage.From the construc- tion practice of Heigou Super-large Bridge in Inner Mongolia,this paper discusses the control method for construction control of continuous prestessed concrete frame bridge.The process of construction was emulated through the determination for finite ele- ment model for the whole bridge,thereby calculating the value of prestressing tendons,the displacement and the stresses at the different stages of construction,with the comparative analysis on the measured results at the field,obtaining the regular pattern of stresses and deflections at the different sections of the box beams under the various loads,the tensioning quality and the margin of stresses,reaching the design requirements and the anticipated goals,realizing real-time monitoring.
What problem does this paper attempt to address?