Simulation on Lightning Overvoltage of ± 800 Kv Converter Station's AC Yard

傅玉洁,苏菲,陆华,王东举,丁健
DOI: https://doi.org/10.3969/j.issn.1004-3950.2011.05.003
2011-01-01
Energy Engineering
Abstract:Zhexi station and it's 2 km line in segment's mode were studied,the selection of lightning's amplitude was discussed.EMTP was used to analyze the equipment's lightning overvoltage.To analyze the most serious situation,the selection of AC field's operation mode was discussed in detail,finally measures to limit the lightning overvoltage were introduced.
What problem does this paper attempt to address?