Analysis on peak-load regulating operation of Three Gorges Hydropower Station

ZHANG Taotao,HU Xiaoyong
DOI: https://doi.org/10.3969/j.issn.1000-0860.2012.09.026
2012-01-01
Abstract:The peak-load regulating operation of Three Gorges Hydropower Station since its commissioning in 2003 is analyzed and summarized herein,and then the peak-load regulating operation of the hydropower station during the conventional operation period is also discussed and analyzed under the considerations on the relevant factors such as the operation principle of Three Gorges Reservoir,the characteristics of the cascade hydro-projects,the operation performance of the generator units,the requirements of the power grid system,etc.