Analysis of Overall Technical Features of Hydro Turbines of Xiluodu Project and Xiangjiaba Project

王正伟,黄源芳,刘洁
2012-01-01
Abstract:After completion of the Three Gorges project in China, another two giant hydropower projects, Xiangjiaba and Xiluodu, are under construction on the Jinsha River that is the upstream section of the Yangtze. They are to be equipped with twenty six generating units and a total installed capacity more than 20 260MW. According to the schedule, their first units will be put into operation in 2012 and 2013, respectively. This paper presents an overview on the overall technical features of the turbines in these plants, and discusses the performances of the turbines, focusing on the research work in operation stability and the development of "hydroelectric generating units of million-kilowatts"
What problem does this paper attempt to address?