Research on Peak Regulation Capacity of Xiaolangdi-Xixiayuan Cascade Hydropower Station

LIAO Xinyu,LI Yuming,ZHU Xuping,ZHAO Ke,BAI Tao,GAO Kaiyang
2011-01-01
Abstract:Aiming at the urgent problem of short-term peak shaving scheduling of Xiaolangdi-Xixiayuan Cascade Hydropower Station,based on the practical operation of Xiaolangdi Hydropower Station,it formulates the joint optimal scheduling of two reservoirs.And then the feasibility of the optimal scheduling is verified with joint optimal operation software of cascade hydropower stations.Finally,it draws a conclusion that the daily outflow of Xiaolangdi Reservoir and water consumption rate can be reduced by takes full advantage of Xixiayuan counter regulation reservoir capacity during the period of valley interval in power grid;and it improves two reservoirs operation mode of peak-to-valley ratio.