Research on short-term multi-level and multi-objective optimal scheduling of cascade hydropower stations under complex water resources and power constraints

WEN Xin,LIU Fanqian,TAN Qiaofeng,WANG Hao
DOI: https://doi.org/10.13243/j.cnki.slxb.20220852
IF: 2.4
2023-01-01
Journal of Hydraulic Engineering
Abstract:The high-intensity peaking and frequency regulation tasks of power grids and the strict water dispatch requirements of river basins limit the optimization space of the scheduling operation of cascade hydropower plants,resulting in difficulties in coordinating water and power regulation,insufficient efficiency and long-time inefficient operation of units.In this paper,the objectives of power generation efficiency,peaking capacity and operating conditions of the unit were considered,and the scheduling models of power grids,cascades and power stations were established at different levels,and the multi-level multi-objective cooperative optimization mechanism was studied and model solution methods were proposed.By nesting different levels with each other and rolling forward,the safe and efficient operation of the cascade hydropower plants is ensured under complex water and power constraints.Taking the upper reaches of the Yellow River hydropower base as an example,the method can increase the power generation capacity of the cascade hydropower plants by 2.75%,reduce the water consumption rate by 2.38%,and reduce the inefficient operation time of the units by 50.64% under the premise of guaranteeing the water dispatch requirements of the Yellow River basin and the full consumption of a high proportion of scenery in northwest China.It has scientific significance and practical value for scientific scheduling and safe operation of cascade hydropower.
What problem does this paper attempt to address?