Abstract:The load distribution of cascade hydropower stations is related to the safe operation of hydropower stations and power grids. The traditional load distribution of cascade hydropower stations does not consider synchronous operation of water level. The inconsistent water level variation process of cascade hydropower stations is not conducive to the safe operation of hydropower stations and power grids. In view of this problem, the main purpose of this paper is to introduce the concept of equal reservoir full storage rate (ERFSR) to guide the load distribution of cascade hydropower stations. In addition, considering the advantages of rapid start-stop of hydropower units, hydropower is used for new energy consumption. The load distribution model of cascade hydropower stations is established, and three cases are set to verify the universality of the proposed model in the upper reaches of the Yellow River. The results show that (1) The concept of ERFSR can effectively guide load distribution and realize water level synchronization of cascade hydropower stations. (2) The output process of each hydropower station can be basically consistent with the load process to achieve synchronous peak shaving. (3) New energy consumption has little effect on the daily water consumption of downstream cascade hydropower stations.
What problem does this paper attempt to address?