Calculation of Comprehensive Power Output Coefficient of a Hydropower Station and Its Effects on Simulating the Regulation Process

魏加华,李想,刘荣华
DOI: https://doi.org/10.3724/sp.j.1201.2012.01014
2012-01-01
Abstract:Optimal operation of the cascaded hydropower station is an important subject for the research on the large hydropower complex,and the quality of the operation scheme can affect significantly the generation benefits of the hydropower station.During the modeling of the operation scheme,calculation of the power outputs is one of the core works.Previous research on the optimal operation of power plants focused on the application of the optimal algorithms,and the development of the model was seldom described.This paper presents the calculations of the power output coefficients of the Three Gorge and Gezhouba power plants based on their operation data,which can provide the accurate data for future modeling of the operation scheme.Moreover,the power outputs for the two plants have been simulated using the proposed new method and the preliminary analysis of the power outputs results is reported.
What problem does this paper attempt to address?