Peak-load and Intermittent Power Regulations by Cascade Hydropower-Models

唐新华,周建军
2013-01-01
Abstract:Hydropower is capable of peak-load and intermittent power regulations.The largest cascade hydropower plants(CHPs) are mushrooming in the west of China after the commencement of the Three Gorges Project(TGP).To optimize the future role of hydropower,especially CHP,to satisfy the increasing needs of regulating facilities from the expending nets and the development of intermittent renewable energy such as wind and photovoltaic electricity,it is highly necessary to consider the use such CHP mainly for regulations.In this paper,a fully coupled unsteady flow model for the 6 cascade reservoirs in the upper-Yangtze and the lower Jinsha River is developed,complemented with models for the dynamic programming of deregulation reservoirs and load distribution from the net to power-plants.The hydraulic model was verified with data from the real operations of the TGP and the Gezhouba reservoirs.It indicated that the present model can be used to study the large scale peak-load and intermittent power regulations with rapid variations in hydraulic conditions.
What problem does this paper attempt to address?