Discussion on TEV Measurement of Disconnector Switching Bus-charging Current Test in Smart GIS

JIA Tao,LI Qiang,WANG Chun-jie,ZHANG Xian,ZHANG Xiao-yong
DOI: https://doi.org/10.13296/j.1001-1609.hva.2012.10.020
2012-01-01
Abstract:With the rapid development of smart grid construction,smart switchgears are used more and more broadly,and their reliabilities have attracted even more wide attention.In order to verify the reliability of the smart data collecting unit of smart GIS by testing,related research through the test duty 1 and 3 of disconnector switching bus-charging current have been done.In this paper,the TEV is measured through test duty 1 and 3 of disconnector closing and opening bus charging current in 363 kV smart GIS,the test process and test circuits are introduced.The distribution of TEV voltage is summarized from the measured TEV data,and the reasons are analyzed.The experimental study in this paper provides some experience to the test method for verifying the antielectromagnetism interference ability of smart switchgears.
What problem does this paper attempt to address?