Abstract:In order to suit the requirements for operation with low load of urea plant,the technical measures——increasing the ratio of ammonia/carbon of system,increasing the oxygen content in co2,stabilizing the discharging material of reactor,increasing the added steam quantity etc.in shell side of ammonia stripper——were adopted to facilitate the system stability,energy conservation/consume reduction and anti-corrosion of equipment for the urea plant.According to the supply situation of raw natural gas,the prilling load of urea was adjusted in a suitable time;the new method of intermittently prilling was adopted in order to ensure the quality of urea product.