Injection orbit matching for CSNS/RCS

Xiaohan Lu,Ming-Yang Huang,Sheng Wang
DOI: https://doi.org/10.48550/arXiv.1802.05381
2018-02-15
Accelerator Physics
Abstract:The Rapid Cycling Synchrotron(RCS) of China Spallation Neutron Source(CSNS) employs painting injection to achieve uniform beam distribution and suppress space-charge effects. In the painting injection, the mismatch between the injection beam orbit and circulating orbit could make the non-uniformity of beam distribution and emittance growth, which may lead to beam loss. To match the injection beam orbit and the circulating beam orbit, it is necessary to identify the orbit of injection beam relative to the circulating orbit in the injection point. However, it's hard to measure this relative injection orbit directly. Theoretically, the relative injection beam orbit can be deduced by measuring the turn-by-turn beam position of a single turn injection beam. However, the intensity of single turn injected beam is too low to be measured with sufficient signal-noise ratio by using beam position monitor(BPM). In this paper, two effective methods based on multi-turn injection and turn-by-turn BPM are given to perform the match between the injection and the circulating beam orbit. The simulation results and application in the beam commissioning of CSNS/RCS show the validity of the methods.
What problem does this paper attempt to address?