Method for reinforcing bridge erecting machine

向世国,曾文科,陈晓飞,周平,杨昌勇,蒋枭,李信运,刘虎,张良,赵伟
2017-05-25
Abstract:The invention discloses a method for reinforcing a bridge erecting machine. The method comprises the following steps that A, relative parameters such as the length and the diameter of each front supporting leg and the diameter of each pier column are measured; B, direct calculating or finite element calculating is conducted to determine a transverse reinforcing scheme and a longitudinal reinforcing scheme, wherein the transverse reinforcing scheme comprises the step that a plurality of supporting rods are connected between the two front supporting legs, and the longitudinal reinforcing scheme comprises the step that a plurality of supporting rods are connected between the pier columns and the front supporting legs; C, steel materials with corresponding section parameters and the corresponding lengths are selected; and D, the steel materials with the selected models and parameters in the step C are cut, and the front supporting legs and the pier columns are connected and reinforced according to the reinforcing schemes in the step B. By means of extra reinforcing measures, the weight of the whole machine can be reduced, and the manual labor of workers in the detaching process also can be reduced, most importantly, the problems of stability losing and fracturing of the front supporting legs the in the process of detaching and erecting a beam body is avoided, and the method can be widely applied to reinforcing of front supporting legs of various bridge erecting machines.
Engineering,Materials Science
What problem does this paper attempt to address?