Replacement Construction of Gusset Plates at Adjustable Stringers for Rail-cum-Road Steel Truss Girder Bridge

Wei LI,Bo JIN
DOI: https://doi.org/10.3969/j.issn.1671-7767.2014.06.017
2014-01-01
Abstract:T he main bridge of Zhicheng Changjiang River Bridge is a rail‐cum‐road continuous steel truss girder bridge with span arrangement of (4 × 160+5 × 128) m .The steel truss girder of the main bridge adopts the type of steel truss like Chinese character “米” .After serving for more than 40 years ,the gusset plates at the adjustable stringers w hich connect the vertical tensile plates in the main railway bridge have cracks (a total of 4 locations with cracks) .To ensure the bridge structure and the train riding safety ,based on the analysis of the fracture deterioration of the gus‐set plates at the adjustable stringers ,and on the premise that the railway transportation safety is ensured ,the failed gusset plates ,angle steel and tensile plates were replaced .The replacing tech‐nique for the gusset plates starts from the removal of the connecting bolts and the demolition of the connecting chords and plates of the original gusset plates (dismantling the subsidiary connecting chords first and the main connecting chords later) .Then ,the contact surfaces of the original con‐necting holes and the chords were treated .The installation of the new chords follows the reversed procedure of the demolition (installing the main connecting chords and gusset plates first and the subsidiary gusset plates later) .The results of the structural analysis indicate that the overall load bearing capacity of the adjustable stringers is strengthened ,which can meet the demands of the contraction and extension deformation of the railway bridge .The replacements of the components were carried out during the railway maintenance duration ,and the whole construction exerts no in‐fluence on the safety of the railways in service .
What problem does this paper attempt to address?