Assessment of Remaining Fatigue Life for Existing Riveted Railway Bridges Based on Fracture Mechanics

WANG Chun-sheng,CHEN Ai-rong,CHEN Wei-zhen,NIE Jian-guo
DOI: https://doi.org/10.3321/j.issn:1671-8879.2005.02.013
2005-01-01
Abstract:In China the existing riveted railway bridges are often required to carry an increasing volume of traffic, usually consisting of trains heavier than those considered in the original design. An improved method for the estimation of the actual fatigue life and safety of such structures are required in order to make their continued safe use. Through the example of Ganjiang Bridge on Jing-jiu railway line, the fracture mechanics model applied to evaluate the remaining fatigue life of existing riveted railway bridges is investigated. The general procedure to determine the remaining fatigue life of existing riveted railway bridges can be divided into the following four steps: identification of the vital elements to be analyzed from bridge system, calculation of the critical crack size, simulation of crack growth from the initial crack size to the critical crack size, determination of economical and safe inspection intervals. According to the remaining fatigue life assessment results of Ganjiang Bridge, the inspection intervals for assuring the normal service function is only one year, and the inspection intervals for assuring the load-carrying capacity of main truss is three years.
What problem does this paper attempt to address?