The General Layout Design of the Gelantan Hydropower Project

Li Mei
Abstract:The roller compacted gravity dam,the flood relief and energy dissipation structures and the power waterway system are the three main structures of the Gelantan Hydropower Project.The Paper has made optimization of the design of the general layout of the Gelantan hydropower project complex by means of comparison according to the detail study results of both topographical and geological conditions of the dam site,taking into consideration fast placement technology of the roller compacted concrete so that the problem of laying out the project complex in a narrow river valley with high slopes and large discharge has been solved.
Engineering,Environmental Science
What problem does this paper attempt to address?