Abstract:Changzhou Hydraulic Complex is a runoff river power station with low head and mass flow,built in the river bed by crossing three rivers and two islands.It is mainly composed of such structures as power house,concrete discharge sluice,concrete gravity dam,ship lock,fish way,switch yard and RCC earth-rock filled dam.Its reservoir has a normal pool level of 20.6m and a total storage capacity of 5.6billion m3.Navigation structure is a double-line single ship lock(1×2000t + 1×1000t).Concrete gate dam,concrete gravity dam and RCC earthrock filled dam are built for retaining water.The power house in river channel is equipped with 15 bulb tubular units with an installed capacity of 45MW for each,a total installed capacity of 630MW,and an average annual energy output of 3014.68million kW·h.
Engineering,Environmental Science