Abstract:Water intake project of Jiaxing 2~ nd stage power plant is located in Hangzhou bay which ocean condition is very severe. The project is constructed with immerse concrete tube method, and the water intake caisson is a barrel type structure with 25m diameter, 16.6m height and approximately 4700 ton weight, the floating and sinking construction is so difficult because of stability problems. The stability analysis for different stages of floating and sinking prouides the scientific basis for optimize the sinking scheme and assure the locating precision of water intake caisson, and offers the references for other similar projects.