STABILITY ANALYSIS OF COFFERDAM SLUMP AND ITS APPLICATION IN THE CLOSURE OPERATION OF THREE GORGES PROJECT

Guangqian Wang,Zhou Hou-gui
1997-01-01
Abstract:A theoretical model is built to calculate the slump of dike head during process of cofferdam construction in river closure operation. Considering flow scours, the depth of scouring zone is estimated and its effect on slump scale can be determined. Using the theoretical model to analyze stability of cofferdam of The Three Gorge Project, slump length and volume of dike head in the river closure operation are predicted. When closure gap is 1 10-80m wide, slump occurs heavily and the maximum slump length of dike head reaches 7m.
What problem does this paper attempt to address?