Study on Optimal Grouting Timing for Controlling Uplift Deformation of a Super High Arch Dam
Peng Lin,Xiaoxu Zhu,Qingbin Li,Hongyuan Liu,Yongjun Yu
DOI: https://doi.org/10.1007/s00603-015-0732-z
IF: 6.518
2015-03-18
Rock Mechanics and Rock Engineering
Abstract:A grouting model is developed for use during the grouting of the complex foundation of a super high arch dam. The purpose as to determine the optimal grouting timing and appropriate grouting pressure involved in controlling the uplift deformation of the dam. The model determines the optimal grouting time as the height of the arch dam increases with the concrete pouring, by checking the tensile stresses in the dam against standard specifications. The appropriate grouting pressures are given on the basis of the actual grouting pressures monitored during the upstream riverbed foundation grouting. An engineering procedure, applying the model, was then proposed and used during foundation grouting under the toe block of the Xiluodu super high-arch dam in south-western China. The quality of the foundation grouting was evaluated against the results from pressurized water permeability tests, acoustic wave velocity tests, elastic modulus tests and panoramic photographing of the rockmass on completion of the foundation grouting. The results indicated that the proposed grouting model can be applied to effectively reduce the uplift deformation and associated cracking risk for super high arch dams, and it can be concluded that the proposed engineering grouting procedure is a valuable tool for improving foundation grouting under the toe blocks of a super high arch dam.
geosciences, multidisciplinary,engineering, geological