Research and Analysis on the Optimization of the Preventive Disassembly Inspection Intervals of Important Wedge Gate Valves in the Primary Cooling System of CPR1000 Nuclear Power Plant

Lifei Yang,Daqi An,Guangyu Li,Jun Zhou,Xiaoyou You,Guanghui Cao
DOI: https://doi.org/10.1088/1742-6596/2694/1/012012
2024-02-08
Journal of Physics Conference Series
Abstract:At present, the important wedge gate valve of the primary coolant system of the CPR1000 nuclear power plant performs preventive disassembly inspection according to the intervals of 5 years, the average dose of a single disassembly is about 10mSv, the average time of each overhaul occupies the critical path is 1 hour, and the valve has been disassembly inspection in good condition. Based on the historical maintenance data, operating environment, failure mode, failure mechanism, operation and maintenance experience feedback of the same type of valve, and failure risk control of the important wedge gate valve of the primary coolant system, this paper demonstrates and analyzes the feasibility of extending the disassembly inspection intervals of the important wedge gate valve of the primary coolant system from 5 years to 10 years. This work plays an important role in improving the economic efficiency of nuclear power plant maintenance and reducing the radiation dose of maintenance.
What problem does this paper attempt to address?