APPLICATION OF RISK-INFORMED DECISION FOR ONLINE MAINTENANCE OF TIANWAN NUCLEAR POWER PLANT SAFETY SYSTEMS

Gu xiaohui,yufeng Guan,Li youyi,Sun Yang,Yu wenge
DOI: https://doi.org/10.1299/jsmeicone.2019.27.1950
2019-01-01
The Proceedings of the International Conference on Nuclear Engineering (ICONE)
Abstract:Units 1&2 of Tianwan Nuclear Power Plant (TNPP) are VVER-1000 reactors equipped with four independent safety system channels. This paper used the risk-informed decision approach to optimize the Surveillance Test Interval (STI) and the Allowable Configuration Time (ACT) of 5 safety systems and their support systems. The STI optimized from 1 month to 2 months, the Core Damage Frequency (CDF) of full power, low power, and shutdown conditions increased 2.05E-7 in total (The unit of CDF/LERF/△CDF/△LERF all in this paper is “/y”, y is year), and the Large Early Release Frequency (LERF) only increased by 9.2×10-9. Meanwhile, the ACT was optimized from 31 hours to 31 hours plus 3 days when a safety system having two channels outage at the same time, the increase value of the Incremental Conditional Core Damage Probability (ICCDP) of each safety system is less than 1E-6 and Incremental Conditional Large Early Release Probability (ICLERP) less than 1E-7. A real-time Risk Monitor (RM) system was developed in this study based on the full digital instrumentation & control system in TNPP. The RM is able to detect status changes of safety systems/components during online maintenance in second time-scales, and then estimate the corresponding risk. With those optimizations, online maintenance of TNPP was performed successfully for the first time. This is also the first time online maintenance performed in China.
What problem does this paper attempt to address?