Probabilistic Risk Assessment for Loss of Offsite Power of Tianwan Nuclear Power Plant

宋云亭,郭永基,鲁宗相,盛维兰
DOI: https://doi.org/10.3969/j.issn.0258-0926.2003.05.019
2003-01-01
Abstract:This paper proposed a comprehensive probabilistic risk assessment method for evaluation of loss of offsite power events in Tianwan Nuclear Power Plant (TNPP). TNPP is connected to East China Power System (ECPS). TNPP and ECPS are interdependent. There are 4 events which may cause TNPP loss of offsite power are considered in the method: 1. Loss of power system stability; 2. Unavailability of total links between TNPP and ECPS caused by overlapping of scheduled maintenance and forced outages; 3. Un-availability of total links between TNPP and ECPS caused by severe weather; 4. Unavailability of step-up 500kV and 220kV substations caused by equipment failures. Calculation methods and results of these 4 events were provided. Some actions to improve the reliability of system are proposed.
What problem does this paper attempt to address?