Probabilistic Assessment of Loss of Outsite Power Supply for T Nuclear Power Plant

宋云亭,郭永基,盛维兰,方文
DOI: https://doi.org/10.3969/j.issn.1004-9649.2002.12.007
2002-01-01
Abstract:The probabilistic ass es sment of loss of offsite power for T nuclear power plant (TNPP)is evaluated b y reliability engi-neering method.TNPP is connected to external power system b y four lines and they are interdependent.Three categories of the events,which may cause loss of offsite power for TNPP,are considered in the paper:(1)Lo ss of power system stability;(2)Un-availability of total links between TNPP and four offsite power supply lines caused by simultaneously scheduled mainten ance and forced failures;(3)Unavailability of total links between TNPP and f our offsite power supply lines caused by severe weather(main-ly are big winds ).The calculation methods and results of these three events are provided.Some measures are proposed to improve the reliability of system.The conclusions ar e valuable for operation stability of power system and safety assessment of nuc lear power plant.
What problem does this paper attempt to address?