Discussion on Construction Techniques of Bored Pile of Fuwan Grand Bridge in Karst Ground and Deep Water

Hu Xiong
2008-01-01
Abstract:The foundation of main pier No.56 of Fuwan grand Bridge is composed of 18φ2.5 m large diameter bored piles.The factors such as the locations of the pile foundations,the situations of deep water,bare and tilted bed rocks and karst ground make the construction technology for the foundations complicated.The programe of setting of steel casings with the mature and effective methods of advance drilling and throwing fills in the clay and the slabstone and the cement is taken.According to the experience in dealing with dissolved cave leaking thick liquid,collapse hole,card hammer and bury hammer,this paper summarized the deep water karst pile construction techniques.