On problems of drilling piles and strategies
Yonggui Dong
DOI: https://doi.org/10.3969/j.issn.1009-6825.2015.03.032
2015-01-01
Abstract:From related procedures of bridge pile foundation,the paper mainly illustrates some problems in the construction process of drilling piles by referring to the construction site,and points out factual strategies,so as to accumulate experience for pile foundation projects.
What problem does this paper attempt to address?