Experimental study on the bored pile construction's influence on the safety of existing bridge

Zhu Jiancai,Xu Minglai,Zhu Jianfeng,Xu Riqing,Zhou Qunjian
2012-01-01
Abstract:Both the foundations of the under-construction Qianjiang New Rail-Bridge and the existing Qianjiang Second Bridge are bored pile foundation.As they are close to each other(about 10m),the foundation of the Qianjiang Second Bridge may be disturbed by the bored pile's construction of the new rail-bridge.Moreover,it may result in the horizontal and vertical movements of the existing bridge.The project team has monitoring on lateral movement,earth pressure,pore water pressure and layered settlement of the soil around the under-construction bored pile through laying the gradient tubes,inclinometers,earth pressure cells,pore water pressure gauges and telescoping tube settlement gauges.It is found that the soil lateral movements caused by the construction of the new bridge's bored pile are mainly within the limit of five times bored pile diameters and maximum settlements are merely 5mm,and the construction of the new bridge's bored pile has little effect on the earth pressure and pore water pressure of surrounding soils.Therefore,the construction of the new bridge's bored pile has little influence on the safety of the Qianjiang Second Bridge.
What problem does this paper attempt to address?