Synchrotron Injection and Acceleration Commissioning of Xi'an 200 MeV Proton Application Facility

LIU Xiaoyu,YAO Hongjuan,LI Yan,YE Wenbo,YANG Ye,ZHENG Shuxin,GUAN Xialing,WANG Xuewu,LIU Wolong,WANG Minwen,WANG Di,ZHAO Mingtong,WANG Zhongming
DOI: https://doi.org/10.12061/j.issn.2095-6223.2023.010405
2023-01-01
Abstract:A commissioning method for the injection, capture, and acceleration processes of compact synchrotron rings is proposed and applied to the synchrotron commissioning of the Xi’an 200 MeV Proton Application Facility(XiPAF). FCT is used to measure the current of injected beam, and closed orbit curve is used to correct RF frequency curve to improve acceleration efficiency. After injection bump curve optimization, closed orbit correction, tune adjustment, dual harmonic RF capture and acceleration, the maximum injection beam current of 47 mA is obtained, which corresponds to the particle number 2.5×10 11 . The maximum acceleration beam current of 53 mA is achieved, which corresponds to the number of particles 1×10 11 , and basically reach the design goal. By comparing the results of experiment measurement and simulation calculations, the deficiencies in the current commissioning are analyzed, and suggestions for the key tasks of future commissioning work are given.
What problem does this paper attempt to address?