Commissioning of the 7 MeV H<SUP>-</SUP> linac injector for a 200 MeV proton synchrotron

Zhongming Wang,Ye Yang,Wolong Liu,Baichuan Wang,Minwen Wang,Di Wang,Maocheng Wang,Wei Lv,Yihua Yan,Mingtong Zhao,Wei Chen,Mengtong Qiu,Pengfei Ma,Xudong Yu,Yu Lei,Shuxin Zheng,Changtong Du,Chongbo Bi,Huayi Zhang,Xialing Guan,Xuewu Wang,Qingzi Xing
DOI: https://doi.org/10.1016/j.nima.2022.167244
2022-01-01
Abstract:This paper describes the beam commissioning progress of the 7 MeV H- linac injector for the proton synchrotron of Xi'an 200 MeV Proton Application Facility (XiPAF). To fulfill a flux of 10(5)similar to 10(8)p/cm(2)/s with a uniformity better than 90% on a 3 cm x 3 cm sample size at the experimental station, the number of the accumulated protons in each cycle in the synchrotron is designed to be larger than 2 x 10(11). The protons are acquired from the H- beam stripped by the carbon foil, which enables transverse space painting during injection. The maximum pulse length of the injected beam is 40 mu s. With an estimation of 40 for the intensity gain factor, the injected beam is required to have a peak current of higher than 1 mA, with the normalized transverse emittance of 90% particles less than 6 and 4 pi. mm mrad for the horizontal and vertical planes, respectively, and the momentum spread of 90% particles within +/- 0.45%. The injector mainly consists of an H- ion source, a low energy beam transport line (LEBT), a 3 MeV radio frequency quadrupole (RFQ) accelerator, a 7 MeV interdigital H-mode drift tube linac (IH-DTL), and an injection beam transport line. After several stages of beam commissioning, the linac injector has reached a pulsed peak current of 2.5 mA, with normalized emittance (90% particles) less than 4.4 and 2.2 pi mm mrad, 90% momentum spread less than +/- 0.55%, which lays a good foundation for the beam commissioning of the synchrotron.
What problem does this paper attempt to address?