Advances of the FRIB Project
J. Wei,H. Ao,S. Beher,N. Bultman,F. Casagrande,S. Cogan,C. Compton,J. Curtin,L. Dalesio,K. Davidson,K. Dixon,A. Facco,V. Ganni,A. Ganshyn,P. Gibson,T. Glasmacher,Y. Hao,L. Hodges,K. Holland,K. Hosoyama,H. -C. Hseuh,A. Hussain,M. Ikegami,S. Jones,T. Kanemura,M. Kelly,P. Knudsen,R. E. Laxdal,J. LeTourneau,S. Lidia,G. Machicoane,F. Marti,S. Miller,Y. Momozaki,D. Morris,P. Ostroumov,J. Popielarski,L. Popielarski,S. Prestemon,J. Priller,H. Ren,T. Russo,K. Saito,S. Stanley,M. Wiseman,T. Xu,Y. Yamazaki
DOI: https://doi.org/10.1142/s0218301319300030
IF: 0.924
2019-01-01
International Journal of Modern Physics E
Abstract:The Facility for Rare Isotope Beams (FRIB) Project has entered the phase of beam commissioning starting from the room-temperature front end and the superconducting linac segment of first 15 cryomodules. With the newly commissioned helium refrigeration system supplying 4.5[Formula: see text]K liquid helium to the quarter-wave resonators and solenoids, the FRIB accelerator team achieved the sectional key performance parameters as designed ahead of schedule accelerating heavy ion beams above 20[Formula: see text]MeV/u energy. Thus, FRIB accelerator becomes world’s highest-energy heavy ion linear accelerator. We also validated machine protection and personnel protection systems that will be crucial to the next phase of commissioning. FRIB is on track towards a national user facility at the power frontier with a beam power two orders of magnitude higher than operating heavy-ion facilities. This paper summarizes the status of accelerator design, technology development, construction, commissioning as well as path to operations and upgrades.