Analysis of influence of position of arch double row isolated pile on existing tunnel

XU Changjie,ZENG Xiaoxin,QI Xiaokai,ZHAO Xiushao
DOI: https://doi.org/10.19713/j.cnki.43-1423/u.2018.06.019
2018-01-01
Abstract:Based on an excavation of building basement in Hangzhou, a three-dimensional model was established by using ABAQUS finite element software. The bored pile of foundation pit supporting structure was transformed into underground continuous wall, and linear Drucker-Prager hardening constitutive model was used to analyze. The displacement of the tunnel and arch double row isolated pile under different positions of isolation piles was studied. The results show that, when the double arch isolation pile located at about 10 m of foundation pit and the curved row pile in tunnel, the tunnel lining displacement reaches the minimum. The arch located at 12 m of foundation pit, the displacement and stress value of isolation piles is minimum. The stress values under different degrees of tunnel lining decrease first and then increase. Pile tail arc displacement is smaller than the straight pile, while curved row pile head displacement is greater than the straight pile. When the isolation pile is near the pit, arched row pile displacement is larger than the straight pile. The contrary is the case when the isolation pile is near the tunnel.
What problem does this paper attempt to address?