Effect Analysis of Frame Building Crossed by Double-Line Parallel Shield Tunnel

Wei Gang,Wei Xinjiang
2013-01-01
Abstract:Considering the interaction of building-soil-tunnel,the frame building with independent foundation vertically crossed by double-line parallel shield tunnel was simulated by 3D MIDAS / GTS software,and the impact of tunnel construction on the building was analyzed.The results show that: in the case that the left lane of the tunnel crossed the building,along with the right line shield machine traversing building around,the differential settlement decreases gradually at the left and right sides of building,the settlement of right line slightly larger than that at the left lane after the right line tunnel passes completely.During shield tunnel excavation,the top of the building's foundation had uneven settlement in the driving direction,and it increased first then decreased gradually to zero.The biggest first principal stress P1 of the building surpasses the normal value,possibly causes cracking of a part of construction structure;Along with the enlargement of interval L from middle line of the building to two tunnel axes,the building has a trend to dump to the tunnel side,the biggest first principal stress and the biggest shearing strain has a tendency as a whole to be reduced.The change of differential settlement between columns is little.
What problem does this paper attempt to address?