Effect analysis of Double-O-Tube Shield Tunnel Crossing Frame Structure Building with 30 degrees

Gang Wei,Dongdong Chen,Jie Hong
2012-01-01
Disaster Advances
Abstract:Considering the interaction of building-soil-tunnel, the grillage beams foundation frame building with 30 degree crossed by Double-O-Tube (DOT) shield tunnel was simulated by 3D MIDAS/GTS software and the impact of construction on the building was analyzed. The results show that during the passage of shield tunnelling through the building, the building settlement increases. The settlement is stable and has a little rebound when shield machine already passes the building. During shield tunnel excavation, the building's foundation has uneven settlement in driving direction and it increased first then decreased. Because of good integrity of framework structural, the building does not have large uneven settlement during shield tunnel excavation. With the increase of driving distance, the first principal stress P-1 increases and then becomes stable. With the increasing of axis distance between tunnel and building (L) from zero, the first principal stress P-1 tends to gradually reduce the security value and the maximum differential settlement between columns gradually decreases.
What problem does this paper attempt to address?