Shield Tunnel Construction Induced Influence on the Settlement of Masonry Buildings

SUN Yukun,GUAN Fuling
DOI: https://doi.org/10.3969/j.issn.1001-4632.2012.04.07
2012-01-01
Abstract:Combined with the shield construction of a certain section tunnel engineering of Hangzhou Metro Line 1 cross under 13 residence buildings,through monitoring and analyzing the settlements of the bottom and roof of building during the whole construction period of right-line tunnel(earlier launching) and left-line tunnel(later launching) cross under building,the influence laws of shield tunnel construction on the settlements of surface masonry building were analyzed.Results show that the time-history curves of masonry building settlement are different from that of green field settlement.Especially,the proportion of the subsequent subsidence in cumulative settlement is significantly greater than the case of green field.The settlement curves of the building bottom and roof are approximately in agreement with Gaussian distribution after right-line tunnel passing,and they no longer match with Gaussian distribution after left-line tunnel passing.The settlement curves of masonry building roof are all closer to those of its adjacent facade bottom.The settlement curves of masonry building can be expressed by Peck formula for ground settlement during single line tunnel construction.However,there is an essential difference between them.The stratum loss ratios of the settlement troughs for masonry buildings in Hangzhou area range generally from 0.7% to 6.4%,and the average is 1.98%.The value range for the width parameters of settlement troughs is generally from 0.36 to 1.77,and the average is 0.78.
What problem does this paper attempt to address?