Study on Surface Settlement Due to Tunnel Construction with Shield in Sandy Silt Area

魏纲,杨泽飞,林磊磊
DOI: https://doi.org/10.3963/j.issn.1671-4431.2012.12.019
2012-01-01
Abstract:The problem of excessive ground settlement and continuous alarm of daily ground settlement rate appeared in one shield zone of Hangzhou subway line 2 during the shield construction process,where is mainly distributed of sandy silt soil.Under the statistical analysis and theoretical research of measured data of ground settlement,the result shows that the consolidation settlement completed within one week after the passage of the shield tail due to the relatively big permeability coefficient in the region of mainly sandy silt;the ground settlement becomes stable soon after the passage of the shield tail within a very short time(totally 3~4 days);due to the post-construction consolidation settlement completes very fast,the excess of ground settlement and daily ground settlement rate can be easily caused once the construction settlement is large;the overall amount of consolidation settlement is small,and its average value is 9.7 mm,but the distribution of the maximum ground settlement is very wide,indicating that the level of shield construction has a big influence on ground settlement.
What problem does this paper attempt to address?