Influence of Isolation Pile Diameter on Existing Metro Tunnel Displacement Caused by Excavation of Foundation Pit

Xiaoxin ZENG,Wenxiang DING,Ling PENG,Xiushao ZHAO,Changjie XU
DOI: https://doi.org/10.3969/j.issn.1003-1995.2017.06.23
2017-01-01
Abstract:T he excavation of a deep foundation pit in Hangzhou is the engineering background. A three-dimensional numerical model is established using ABAQUS,a finite element software. T he influence of isolation pile's diameter on existing metro tunnel displacement is analyzed. T he results show that,due to excavation of the foundation pit,the vertical displacement of the ultimate tunnel lining is about 4mm and the horizontal displacement is about 1mm. T he numerical simulation results are in good agreement with the measured values. T he maximum displacement of the tunnel lining is located at the bottom of the arch and the minimum value is located at the vault. T he lining displacement tend to be down as a whole. T he displacement of the tunnel lining side near the foundation pit is larger than that of the other side. T he greater the diameter of isolation pile is,the less the influence of the excavation of the foundation pit on existing metro tunnel is.
What problem does this paper attempt to address?