Crack Control of Floor Plate of Reinforced Concrete During Design and Construction

Dong LI,Zhi-wei LIAN
DOI: https://doi.org/10.3321/j.issn:1006-2467.2005.05.020
2005-01-01
Abstract:The penetrative cracks are often occurred in floor plates of reinforced concrete(RC) structures before the fresh mixture of concrete reaches 28 days design strength of itself during the process of building construction.These cracks in plates of RC,which look like irregularly,could bring much more technical disputation for both designers and constructors.The reasons of the problem were analyzed and the technical measures to control the cracks were presented and discussed based on the simulation.It is found that the effects of the hydration heat of cement and shrinkage can not be neglected.The results may be helpful to the design and construction of this kind of structure and,it is expected to lay a good foundation for the developing of the specification.
What problem does this paper attempt to address?