Grid-tied PV system-based power compensation of a grid equipped with dual interphase power controllers (IPC) 240 with three branches: case of a short transmission line
Guy Roméo Mougnol Assala,Jean-Jacques Mandeng,Charles Hubert Kom,Jean Mbihi
DOI: https://doi.org/10.1007/s12667-023-00636-6
2023-11-14
Energy Systems
Abstract:Three-phase electrical energy transmission lines are generally built to perform symmetrical operations, i.e., if a single-phase or two-phase fault affects a line, all three phases of the line are immediately switched off. The literature shows the advantages of asymmetric exploitation of networks over symmetric exploitation. One of the problems with asymmetrical operation is that the transmitted power is not 100% compensated. In this paper, the IPC 240 with three branches was used for asymmetrical compensation, and for the compensation of the transmitted power reduction, a solar PV system was used. For this, three scenarios were studied on a short transmission line (30 kV, 3 MW) equipped with dual IPCs 240. Scenario 1 was considered when the line was contingency-free, which showed that the IPC 240 had no effect on the network and the transmitted power remained at 3 MW. Scenario 2 was considered when a single-phase contingency arises. The IPCs were reconfigured to assure the asymmetric operation of the line, but it was seen that the transmitted power dropped to 2 MW. Scenario 3 was considered when there was a single-phase contingency on the line and the 1 MW compensating PV system connected to the line. The results obtained in scenario 3 revealed the effectiveness of the power compensation since the power was approximately 97% compensated. The MATLAB/Simulink environment was used for the virtual implementation and validation of the overall proposed system.