Design and operation of wastewater treatment plant in stringent discharge standard

Yongling Chen,Wei Li,Dan Wang
DOI: https://doi.org/10.3969/j.issn.1002-8471.2017.07.003
2017-01-01
Abstract:A second-phase project of a sewage treatment plant in Peking,its effluent quality implement Beijing local standards:Discharge standard of water pollutants for municipal wastewater treatment plants (DB11/890-2012)level A in table 1.The two stage biological treatment process used five stage Bardenpho process,and coagulation-high density sedimentation tankultrafiltration membrane-ozone process was used in the advanced treatment process.The process,design parameters,design features were mainly introduced.Operation practice shows,above combined process has good treatment effect,system running stable,all index of effluent stable reach the standard throughout the year.
What problem does this paper attempt to address?