Upgrade and Operation of Nitrogen and Phosphorus Removal Process in a Sewage Treatment Plant in Shandong Province

Yong-lei WANG,Jun LI,Xun SUN,Wei-yan LIU
DOI: https://doi.org/10.3969/j.issn.1000-4602.2012.22.034
2012-01-01
Abstract:The design capacity of Jinan sewage treatment plant(the second sewage treatment plant) was 20×104 m3/d,and biological treatment process was DE-type oxidation ditch process.Because of high requirement for automatic control,equipment aging and management problem,the DE-type oxidation ditch cannot be operated under alternating anoxic/aerobic conditions.To support the East Route Project of South-to-North Water Diversion and to improve water quality of the Xiaoqing River,water quality improvement and reconstruction of nitrogen and phosphorus removal process were conducted.By adding the diversion wall,nitrification liquid reflux and other measures,the DE-type oxidation ditch process was transformed into A2/O process,while the V-type high-efficiency fiber filter and chemical phosphorus removal process were added.After the upgrade,the process was stable,and the effluent quality met the first level A criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB 18918-2002).
What problem does this paper attempt to address?