Construction Survey Control of Incrementally Launched 8×50-m Span Curved Girders of Donghai Bridge Close to Island Side

HE Zheng-cheng,ZHANG Jian-hong,QIU Qiong-hai,ZHENG Ji
DOI: https://doi.org/10.3969/j.issn.1003-4722.2005.z1.006
2005-01-01
Abstract:This paper deals with the methods for construction survey control of the incrementally launched 8×50-m span curved girders of Donghai Bridge close to island side, and analyzes the key links in the geometry control of the girders. Both the methods and analysis herewith provide certain reference to the construction of similar bridges.
What problem does this paper attempt to address?