THE FRIB SC-LINAC: INSTALLATION AND PHASED COMMISSIONING*
J. Wei,Hiroyuki Ao,Steven Beher,Brian M. Bird,Nathan Bultman,F. Casagrande,Daron Chabot,Wei‐Chieh Chang,Scott Cogan,Chris Compton,John Curtin,Kelly Davidson,Evan Daykin,K. Dixon,Kyle Elliott,A. Facco,Adam Fila,V. Ganni,Andrei Ganshyn,Paul Gibson,T. Glasmacher,Ian Grender,W. Hartung,Leslie Hodges,Kent Holland,K. Hosoyama,H.C. Hseuh,Aftab Hussain,Machiko Ikegami,S. Jones,Takuji Kanemura,Michael Kelly,Sang‐Hoon Kim,P. Knudsen,Martin Konrad,Robert Laxdal,John LeTourneau,Zhiyong Li,Steven Lidia,Guillaume Machicoane,Peter Manwiller,F. Marti,T. Maruta,Ethan Metzgar,Samuel Miller,Dan Morris,Cong Tam Nguyen,Keith Openlander,P. N. Ostroumov,Alexander Plastun,John Popielarski,Laura Popielarski,John Priller,Marc Reaume,Haitao Ren,Thomas Russo,Kenji Saito,Mark Shuptar,J. Stetson,Daniel Victory,Roben Walker,Xiaole Wang,John Wenstrom,M. Wiseman,Mathew Wright,Mengxin Xu,Ting Xu,Y. Yamazaki,Q. Zhao,Shibei Zhao
DOI: https://doi.org/10.18429/jacow-srf2019-mofaa3
2019-01-01
Abstract:The Facility for Rare Isotope Beams (FRIB) superconducting (SC) driver linac is designed to accelerate all stable ions including uranium to energies above 200 MeV/u primarily with 46 cryomodules containing 324 quarter-wave resonators (QWR) and half-wave (HWR) resonators. With the newly commissioned helium refrigeration system supplying liquid helium to the QWR and solenoids, heavy ion beams including Ne, Ar, Kr and Xe were accelerated to the charge stripper location above 20 MeV/u with the first linac segment consisting of 15 cryomodules containing 10⁴ QWRs of β=0.041 and 0.085 and 39 solenoids. Installation of cryomodules with β=0.29 and 0.53 HWRs is proceeding in parallel. Development of β=0.65 elliptical resonators is on-going supporting the FRIB energy upgrade to 400 MeV/u. This paper summarizes the SC-linac installation and phased commissioning status that is on schedule and on budget to the FRIB project.