Study on Combined Cycle Plan of Commercial High Temperature Gas cooled Reactor

XinHe Qu,XiaoYong Yang,Jie Wang
DOI: https://doi.org/10.7538/yzk.2016.youxian.0740
2017-01-01
Abstract:For power conversion unit of the high temperature gas-cooled reactor (HTR),three combined cycle plans were designed.They were compared with closed Brayton cycle at the reactor outlet temperature of 900 ℃.When the reactor outlet temperature is higher,the closed Brayton cycle has a higher reactor inlet temperature which is limited by material of the reactor vessel,and cycle needs a larger compression ratio.In combined cycle,since the reactor inlet temperature is lower than 370 ℃,SA533 steel can be used as reactor vessel without cooling the inner wall.The combined cycle needs a smaller compression ratio.The plan comparison shows that improving the cycle efficiency of the combined cycle needs to increase the bottoming cycle output power.In plan 3,the topping cycle is a simple Brayton cycle,and the bottoming cycle is a reheated Rankine cycle.The efficiency of the combined cycle 3 can obtain 50.1%.
What problem does this paper attempt to address?