Simulation Research on Suppressing Measures Against Severe Ice-shedding Jump of UHVAC Double-circuit Transmission Lines on the Same Tower

Liming WANG,Lu CAO,Hongwei MEI,Ting HUANG,Yayun GAO
DOI: https://doi.org/10.13336/j.1003-6520.hve.20180430011
2018-01-01
Abstract:Ultra-high voltage alternating current (UHVAC) double-circuit transmission lines on the same tower have the advantages of larger capacity and more reduced transmission corridor compared with single-circuit transmission lines. However, when they encounter external forces (such as strong wind and ice-shedding) during operation, accidents of flashover and line collision on double-circuit transmission lines on the same tower may occur more often than on single-circuit transmission lines. We numerically simulated the conductor of double-circuit transmission lines on the same tower using the three-degree-freedom (3DOF) nonlinear simulation model established by Tsinghua University. The 1 000 kV UHVAC double-circuit transmission lines on the same tower were studied under 3 kinds of sever ice-shedding conditions. The conductor suppression effect of traditional phase-to-phase spacer and new phase-to-earth spacer was discussed. When the 1 000 kV UHVAC double-circuit transmission lines on the same tower suffer great ice-shedding, the simulation result shows that either traditional phase-to-phase spacer with height of 20 m and diameter of 95 mm or new phase-to-earth spacer with height of 20 m and diameter of 30 mm has great control on air clearance between phases. During the dynamic operation, the tension and pressure of the insulator are in safe ranges. The transmission lines can also experience multiphase ice-shedding. Under this situation, only using traditional phase-to-phase spacer or new phase-to-earth spacer cannot get satisfactory effects in controlling air clearance. The scheme of applying the combination of new phase-to-earth spacer and traditional phase-to-phase spacer on ice-shedding conductor performs preferably in suppressing air clearance between phases. For specific line and operating condition, the appropriate spacer configuration schemes are also proposed in the conclusion.
What problem does this paper attempt to address?