ANALYSIS AND TREATMENT OF ANCHORAGE FAILURE OF UNBONDED PRESTRESSED CONCRETE BEAM

程柯,肖南,包红泽
DOI: https://doi.org/10.3969/j.issn.1001-6864.2004.06.026
2004-01-01
Abstract:It is the key to anchor the pre-stressed steel strand in unbonded pre-stressed concrete beam.Based on the analysis of tension and anchor of a unbonded pre-stressed concrete beam in a dining hall,the treatment to reinforce the anchor of steel strand is put forward in this paper,and something to be noticed in the process of tension and anchorage are summarized.Practice testified the feasibility.
What problem does this paper attempt to address?