Analysis of the Internal Force in Tall Building Considerd by Construction Process

邬喆华,楼文娟,许国平,何丽波,唐锦春
DOI: https://doi.org/10.3969/j.issn.1001-7119.2004.04.013
2004-01-01
Abstract:Construction process should be considered in structural analysis because the self-weight only affects the finished part of the structure and does not act on the unfinished part. However tall buildings are generally designed on the basis of the whole structure under total loads so that the internal forces are different from the real value. In this paper, the formula for estimating the relative deviation of internal forces obtained by the normal design and by considering construction process is provided applying the principle of structural mechanics. Some factors such as floors、spans、sites、loads and the stiffness ratio of column to beam having influence upon structural performance are discussed. Through calculating reinforced concrete frames, the bending moments obtained by considering construction process are compared to that of design model. Then the relationship between the relative moment deviation and the stiffness ratio of column to beam is drawn. It is suggested that calculated model should accord with the construction process in the design of tall buildings. Lastly, the simple method is put forward to modify the internal forces of design model.
What problem does this paper attempt to address?