ANALYSIS OF INTERNAL FORCE AND DEFORMATION FOR THE NEW CCTV HEADQUARTERS DURING THE CONSTRUCTION PROCESS

Liu Xuewu,Guo Yanlin,Zhang Qinglin,Liu Luyu
2007-01-01
Abstract:The new CCTV headquarters consists of two towers leaning 6° off vertical in both directions,a tremendous 14-story-high cantilever joining two leaning towers at the top and a 9-story-high podium at the bottom.Different construction procedures will lead to different internal force and deformation distribution during the construction process in this complex steel structure.They will be locked within the structure and have to be considered in the structural design.It is evident that there is a great difference in internal force and deformation distribution between according to design model one time loading and according to step-by-step construction process.And it is necessary to take reasonable construction procedures and measures to guarantee the internal force and deformation of the construction-completed structure to meet the requirement given by designers.It is presented the internal force and deformation analysis of the CCTV new headquarters during the construction process by employing nonlinear finite element method,and the internal force and deformation distribution locked in the structure is determined.Lots of numerical results have been obtained as guidelines for the erection and construction of the project.
What problem does this paper attempt to address?