Key Technical Problems on Structural Analysis of Terminal of Guangzhou New Baiyun International Airport

陈国栋,郭彦林,梁志,李伟峰
DOI: https://doi.org/10.3321/j.issn:1000-6869.2002.05.002
2002-01-01
Abstract:Four key technical problems in structural analysis of the terminal of Guangzhou New Baiyun International Airport in China are introduced in this paper. These problems include the global instability of the main building and connecting buildings of the terminal, the influence of membrane tension on supporting structures and the determination of ultimate strength of shuttle shaped steel latticed columns. Geometric nonlinearity is considered in the analysis of the first three problems by use of the ANSYS package. The results obtained indicate that the lateral instability of roof structure of main building of the terminal is rather weak, and structural procedure for enhancing the shear stiffness of roof structure should be taken. The analysis of membrane structure covering the central part of roof structure has been carried out effectively by using a simplified model proposed in this paper. Finally, elastoplastic analysis has been performed for the connection joints at the end of bottom chord of trusses in main building.
What problem does this paper attempt to address?