Simulation Study on Alternative Current Fault at Inverter Side of Yunnan-Guangdong Ultrahigh Voltage Direct Current Island Operation System

LIU Hongtao,ZHANG Yong,MEI Yong,ZHOU Yuzhi,XU Zheng
DOI: https://doi.org/10.3969/j.issn.1007-290X.2015.04.015
2015-01-01
Abstract:Short circuit ratio and effective inertia constant of the sending end grid under island operation mode of Yunnan-Guangdong ultrahigh voltage direct current(UVDC)project is notably lower than that under networking mode which means weak ability to bear turbulence. If commutation of the inverter station fails caused by grounding fault of alternative current (AC)system at the inverter side ,DC voltage and DC power may substantially reduce and cause overvoltage and frequency of the island system at sending end rise. In allusion two typical running modes of Yunnan-Guangdong UVDC island system, PSCAD/EMTDC electromagnetic simulation software was used for studying affect on the island system at sending end by AC system fault at the inverter side. The simulation results indicate that duration time of DC commutation failure is longer caused by AC system fault at the inverter side,short circuit ratio and effective inertia constant at the rectification side is smaller and affect on island system at sending end by the fault is more serious. In addition,under these two typical island op-eration modes,when the AC system at inverter side develops a fault,island system at sending end could still keep transient stability.
What problem does this paper attempt to address?